Footings Sized and Poured for the Load Above

Concrete Footings in Simpsonville for decks, additions, shed foundations, and new construction that require properly excavated and reinforced bearing points

Deck additions and porch expansions on the ranch and split-level homes common across Simpsonville place significant concentrated loads on relatively small bearing points, and the footing that carries each post or pier is what determines whether the structure stays level over time. Tovars Concrete LLC pours concrete footings for decks, additions, sheds, and new builds across Simpsonville, and the owner handles the layout, excavation, and pour personally on every job. A footing that is undersized in diameter, too shallow for the load, or poured without rebar will settle or shift — and the structure above it moves with it.


The process starts with a free on-site estimate, then the crew lays out the footing locations based on the structural requirements of the project, excavates to the depth and width the load demands, sets forms and rebar, and pours and finishes the concrete. Depth is not a number to estimate loosely — it is determined by what the footing is carrying and the bearing capacity of the material at that depth. Before signing a contract, confirm in writing whether the quoted price includes form removal, backfill, and disposal of the excavated spoil, since those steps are sometimes listed as separate line items.


Request a free on-site estimate to have your footing locations, depths, and load requirements reviewed before any work begins.

What Proper Concrete Footings Require on These Projects

On new subdivision builds and on older homes taking on deck or addition work, the footing is the one element of the project that cannot be corrected after the structure above it is built. The crew sets forms to hold the concrete at the right diameter for the load — typically a minimum of twelve inches for residential deck piers, wider for heavier loads — and places rebar within the form before the pour so the finished footing has tensile strength across its full cross-section, not just compressive strength at the top surface.


Once the footings are poured, finished, and cured, the visible result is a set of level, consistent bearing points that match the layout drawings exactly. The framing crew or contractor working above them can set posts or anchor hardware directly without shimming or correcting for variation in height or position. On older Simpsonville properties where previous deck work used inadequate piers or post-in-ground construction, replacing those bearing points with properly sized concrete footings eliminates the rocking and settling that accumulates over years of load cycles.


Rebar sizing and placement inside the footing affects how it performs under lateral load, not just vertical load — a consideration that matters on decks where the ledger and posts are tied together and transfer some horizontal force down to the piers. Tovars Concrete LLC accounts for these load considerations during the layout phase, not after the forms are already set.

What Property Owners Ask About the Work

Questions about concrete footings usually center on how the work is sequenced and what affects the size and depth of each footing. The answers below address the process as it applies to residential and light commercial projects.

  • How is footing depth determined for a deck or addition project?

    Depth is set by the load the footing must carry and the condition of the bearing material at that depth; the crew excavates until they reach stable ground capable of supporting the load without settlement.

  • What role does rebar play inside a concrete footing?

    Rebar adds tensile strength so the footing resists cracking under load; without it, a concrete footing can crack through its cross-section under lateral or uneven vertical loads, particularly on footings carrying multiple spans.

  • When should forms be removed after the pour?

    Forms are typically removed after the concrete has reached sufficient strength to hold its shape without support, which depends on mix design and conditions at the time of the pour; the crew schedules removal accordingly.

  • How do footing requirements differ on newer Simpsonville subdivision builds versus older ranch homes taking on additions?

    New builds follow current code specifications for footing diameter and depth; older homes adding decks or enclosed additions sometimes require larger footings than the original structure used, based on the new load being added.

  • What should the finished footing look like before framing begins?

    Each footing should sit at a consistent elevation relative to the others in the layout, with anchor hardware or post bases set plumb and at the correct spacing so framing proceeds without adjustment.

Tovars Concrete LLC also pours concrete footings in Travelers Rest, Greenville, Fountain Inn, Greer, and Greenwood. Call (864) 800-7187 to arrange a free site visit and have your footing layout and load requirements reviewed before excavation begins.